Home Nzema Gold Project Construction Progress July 2010

July 2010

<p>Plant Overview as at 1 July</p>
Plant Overview as at 1 July

Preparing for Crusher 5th lift

Equipment laydown yard

ROM pad

Tailings Dam access road

Transfer Station wing walls

SAG mill loaded for shipping from Sweden to Ghana

Topsoil dump rehabilitation ongoing

Grade control drilling commences

Jaw Crusher arrives on site - 1 July

Phil Douglas, Logistics Manager, inspects Carbon Regeneration Kiln

Grade control drilling

Norbet Benyah, Senior Geologist, and David McNee, General Manager Ghana
<p>SAG MIll scats bunker underway</p>
SAG MIll scats bunker underway
<p>Ankobra River pipeline underway</p>
Ankobra River pipeline
<p>Crusher 5th (and final) lift completed</p>
Crusher 5th (and final) lift completed
<p>Crusher</p>
Crusher
<p>CIL tanks final lift complete</p>
CIL tanks final lift complete
<p>Fabricated structural steel items begin arriving on site</p>
Fabricated structural steel items begin arriving on site
<p>Plant Overview as at 30 July</p>
Plant Overview as at 30 July
<p>Thickener Area</p>
Thickener Area
<p>ROM pad finishing</p>
ROM pad finishing